8 MergePoint 5224/5240 Service Processor Manager Installer and Administrator Guide
CAUTION: Before you start installation, make sure you review and follow the safety precautions listed in Safety
Precautions and Other Requirements on page 4.
For how to perform optional advanced procedures (connecting PC cards, IPDUs and external
modems), see Chapter 3.
Supplied with the MergePoint 5224/5240 SP Manager
Before installing the MergePoint 5224/5240 SP manager, refer to the following list to ensure you
have all items that come with the SP manager.
MergePoint 5224/5240 Service Processor Manager Quick Installation Guide
Two rack mounting brackets and eight screws
For AC models, an AC power cable
•RJ
-45 to RJ-45 7 ft CAT 5 cable
•DB
-9 female to RJ-45 6 ft crossover cable
Rack Mounting the MergePoint 5224/5240 SP Manager
You can rack mount the MergePoint 5224/5240 SP manager either at the front or the rear of a rack
or cabinet. Observe all safety precautions described in Safety Precautions and Other Requirements
on page 4, especially making sure to load the rack from the bottom up.
Before you start, make sure you have the following:
The two brackets and the eight Phillips screws that are shipped with the SP manager
A Phillips screwdriver
Appropriate nuts and bolts for attaching the brackets to the rack
Decide whether to mount the unit on the front or rear and locate the appropriate sets of holes on the
sides. The locations of the holes for front (A) and rear mounting (B) are shown in the
following figure.
Figure 2.2: Bracket Mounting Holes on the Right Side
A B